Click here to find out how to access this document
Information Paper 8/04 Part 4 Whole building commissioning - facilities managers
Publication Year
2004
Document Status
Archived
Abstract
Approved Document L2 of the Building Regulations asks for building services systems including heating, lighting, mechanical ventilation and air conditioning, to be commissioned. The process involves drawing up a commissioning plan, carrying out commissioning so that the installed systems perform to the designer’s specification, and the production of a certificate confirming that the commissioning has been carried out.
Document History
Whilst this publication can still be purchased some of the information in it has been superseded by more recent research and standards. The BRE Group does not accept any responsibility whatsoever for any loss or damage, including - without limitation - indirect or consequential loss or damage arising from use, or loss of use, of data or profits arising out of, or in connection with, the use of this document.
Author
Grigg, P. F. Graves, H. and Jaunzens, D.
ISBN
9781860817083
Publisher Information
BRE
BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.
IHS BRE Press
The Capitol Building
Bracknell
BRE
UK