DMRB Volume 1 Section 3 BD 28/87 Highway structures: Approval procedures and general design. General design. Early thermal cracking of concrete (Including amendment 1 and NRA addendum - Dec 2000)
Publication Year
1987
Document Status
Withdrawn
Abstract
Gives the requirements for the control of early thermal cracking of reinforced and prestressed post-tensioned concrete members by means of distribution reinforcement.
Document History
Superseded by NRA BD 28/14, DMRB 3.5.8 which includes Annex A NRA Addendum to BD 28/87 Amendment No. 1, and Annex B BD 28/87 Amendment No. 1 Early Thermal Cracking of Concrete. NRA DMRB 1.3 Amendment 1 dated 1989.
Publisher Information
National Roads Authority
The National Roads Authority's (NRA) primary function, under the Roads Act 1993, was to secure the provision of a safe and efficient network of National roads. They were responsible for the planning and supervision of construction and maintenance, publishing the NRA DMRB and NRA MCDRW. In 2016 the NRA merged with the Railway Procurement Agency (RPA) to form a new organisation, Transport Infrastructure Ireland (TII).
St Martin's House
Waterloo Road
Dublin 4
NRA
Ireland