Laboratory Report LR 675 Embankments on soft foundations: settlement and stability study at Over causeway by-pass
Publication Year
1975
Document Status
Withdrawn
Abstract
Describes an investigation of the settlement and stability of a road embankment constructed on compressible alluvium along the re-aligned section of the A40 trunk road to the west of Gloucester. Covers description of site, instrumentation, construction work and site measurement, laboratory and in-situ testing, settlement analyses, calculation of stability, and discussion of results.
Author
Symons, I. F. and Murray, R. T.
Publisher Information
Transport Research Laboratory
The Transport Research Laboratory (TRL) is an internationally recognised organisation providing research, consultancy, testing and certification for all aspects of transport.
							Crowthorne House
							Nine Mile Ride
							
							
							Wokingham
							TRL
							UK
						
							    Website: http://www.trl.co.uk/
    
							    Email: enquiries@trl.co.uk
							    Tel: 01344 773131