JCT Works Contract (WC) WC/2 Works contract 1998 (WC 98) 2: Conditions (including Amendments 1, 2, 3, 5 and 6 with guidance notes)
Publication Year
2003
Document Status
Withdrawn
Document History
Amendment 1 is the construction industry scheme. Amendment 2 is sundry amendments. Amendment 3 is Terrorism/Joint fire code/CIS/SMM. Amendment 5 is the Construction skills certification scheme. Amendment 6 is CDM Regulations.
Publisher Information
Joint Contracts Tribunal
JCT contract documents have been published by Sweet and Maxwell (SMA) since 2005. Established in 1931, the Joint Contracts Tribunal produce standard forms of contracts, guidance notes and other standard documentation for use in the construction industry.
28 Ely Place
London
JCT
UK
Tel: +44 (0)20 7251 7100