Click here to find out how to access this document
Creating excellent secondary schools - a guide for clients
Publication Year
2007
Document Status
Archived
Abstract
The process of rebuilding and renewing secondary schools to ensure that the highest standards of design are achieved. Discusses background to schools projects; creating a vision and appraising options; developing the brief; selecting the team to design and build the school; design development and construction; and what happens after completion.
Document History
This document has been archived by the original publisher.
Publisher Information
Commission for Architecture and the Built Environment
Now defunct, the Commission for Architecture and the Built Environment was the government's advisor on architecture, urban design and public space. They replaced the Royal Fine Art Commission in 1999. In April 2011, the Design Council and CABE joined to become one organisation.
1 Kemble Street
London
CABE
UK