JCT Standard Building Sub Contract (SBCSub) SBC Sub/C JCT standard building sub-contract - conditions. Revision 1 2007 (Replaced by Revision 2 2009)
Publication Year
2007
Document Status
Withdrawn
Abstract
Appropriate for use where the main contract is the Standard Building Contract (with quantities, without quantities or with approximate quantities), and for sub-contract works where the sub-contractor is not required to design. Can be used where the sub-contract works and/or main contract works are to be carried out in sections, and for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement.
Document History
Replaces - JCT 98 Sub contract conditions. Updated by the 2009 revision. Incorporates Amendment 1, issued April 2007 in recognition of new CDM Regulations coming into effect. Includes Updates and Corrections sheet identifying changes made by Revision 1, issued September 2007.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000