Supplementary schedule for contractor's design services (SupCD-07) (pack): Contractor's design services (SS-CD-07) (2009 reprint with corrigenda) (Superseded by 2010 version)
Publication Year
2007
Document Status
Withdrawn
Abstract
Suitable for use where an architect/consultant is required to prepare a design for a development project or a building project procured under the JCT standard form of building contract with contractor's design (JCT DB 05).
Document History
Replaced by Contractor's design services schedule 2010 which is only available as an electronic component of the 2010 RIBA Agreements. Replaces Contractors proposals. Amendment DB2/99 where the client is a contractor (RIBA form of agreement for the appointment of an architect SFA/99). The Supplementary schedule for contractor's design services (SupCD-07) pack comprises of: SS-CD-07 - Contractor's design services. Notes-CD-07 - Contractor's design services: notes on use and completion.
Publisher Information
RIBA Publishing
RIBA Publishing produce best practice, legal, management and technical design guides for architects and other built environments professionals.
15 Bonhill Street
London
RIBAPUBS
UK
Website: www.ribabookshops.com
Email: enquiry.publishing@riba.org
Tel: +44 (0)191 244 5557