JCT Design and Build Contract (DB) DBSub/C JCT design and build sub-contract - conditions. Revision 2 2009
Publication Year
2009
Document Status
Withdrawn
Abstract
Appropriate for use with Design and Build Sub-Contract Agreement and for sub-contract works whether or not they include design by the sub-contractor. Can be used where the sub-contract works and/or main contract works are to be carried out in sections, and for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement of the sub-contract works.
Document History
JCT 2005 Contracts should not be used for construction contracts entered into after 1 October 2011. The principal revision is the incorporation of sustainability provisions, following JCT’s consultation, and provisions building on OGC’s Achieving Excellence criteria. Aspects of the payment provisions have been modified while awaiting the outcome of the proposed payment legislation. Updates the 2007 revision.
ISBN
9780414041219
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000