Engineering Recommendation G81/4 Framework for design and planning of industrial and commercial underground connected loads up to and including 11kV. Part 4: Design and planning. (Issue 2 - Amendment 1 - January 2008)
Publication Year
2008
Document Status
Withdrawn
Document History
Superseded by 'Framework for new industrial and commercial underground connections. Part 4 - design and planning. Issue 3' (ENA, 2016).
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100