JCT Design and Build Contract (DB) DBSub/C JCT design and build sub-contract - conditions (includes New rules of measurement update - 2012) (Withdrawn)
Publication Year
2011
Document Status
Withdrawn
Abstract
Appropriate for use with Design and Build Sub-Contract Agreement and for sub-contract works whether or not they include design by the sub-contractor. Can be used where the sub-contract works and/or main contract works are to be carried out in sections, and for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement of the sub-contract works.
Document History
The current version of this document is Design and Build Contract guide 2024. Current edition: Design and Build Sub-Contract Conditions 2016 (DBSub/C 2016). Previous editions: DBSub/C 2005 (Revision 2 2009). JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000