JCT Standard Building Contract (SBC) SBC/XQ JCT standard building contract without quantities 2011 (includes new rules of measurement update - 2012) (Withdrawn)
Publication Year
2011
Document Status
Withdrawn
Abstract
Appropriate for larger works designed and/or detailed by or on behalf of the employer, where detailed contract provisions are necessary and the employer is to provide the contractor with drawings. Also appropriate when either a specification or work schedules to define adequately the scope and quality of the work and where the degree of complexity is not such as to require bills of quantities. A contract administrator and quantity surveyor will administer the conditions.
Document History
Current edition: SBC/XQ 2016. Previous editions: SBC/XQ 2005 (Revision 2 2009), JCT 1998 (PXQ/LXQ). JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT standard building contract without quantities 2011 (SMA, 2015), which has been included as a separate document. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000