Supplementary Report 783 A numerical investigation of the retaining walls of the Bell Common tunnel
Publication Year
1983
Document Status
Current
Abstract
A section of the M25 goes through a 470 m cut and cover tunnel at the northern edge of Epping Forest. This report presents the class 'A' prediction of the behaviour of the instrumented section of one of the retaining walls of the Bell Common Tunnel, covering wall displacements and bending moments, soil movements and total horizontal stresses.
Author
Potts, D. M. and Burland, J. B.
Publisher Information
Transport Research Laboratory
The Transport Research Laboratory (TRL) is an internationally recognised organisation providing research, consultancy, testing and certification for all aspects of transport.
Crowthorne House
Nine Mile Ride
Wokingham
TRL
UK
Website: http://www.trl.co.uk/
Email: enquiries@trl.co.uk
Tel: 01344 773131