Guidance memorandum to users of the 1999 conditions of contract dated 1st April 2013
Publication Year
2013
Document Status
Current
Abstract
Details the changes to be made for FIDIC dispute resolution Clause 20 and sub-clause 20.7 to be made to the red book (FIDIC Conditions of contract 1999), the yellow book (FIDIC Conditions of contract for plant and design-build 1999) and the silver book (EPC/Turnkey project 1999), setting out the FIDIC intention for the enforcement of the DAB decisions which are binding and not yet final.
Publisher Information
International Federation of Consulting Engineers
The International Federation of Consulting Engineers publishes international contracts and business practice documents for firms supplying technology-based intellectual services for the built and natural environment.
FIDIC
World Trade Center ll
Geneva Airport Box 311
29 route de Prés-Bois CH-1215
Geneva
FIDIC
Tel: +41-22-799-49-00