NRA Interim advice note 08/13 Specification and notes for guidance on the use of permanent repair material systems
Publication Year
2013
Document Status
Withdrawn
Abstract
Gives specification and notes for guidance to the specification on the use of Permanent Repair Material Systems.
Document History
Withdrawn - March 2015 update. This document shall be read in conjunction with all parts of the NRA Manual of Contract Documents for Road Works for Series 900, Road Pavements – Bituminous Bound Materials, NRA IAN 06/13 Procedures for Use of Permanent Repair Material Systems on National Roads and NRA IAN 07/13 Monitoring Phase Procedures for Permanent Repair Material Systems.
Publisher Information
National Roads Authority
The National Roads Authority's (NRA) primary function, under the Roads Act 1993, was to secure the provision of a safe and efficient network of National roads. They were responsible for the planning and supervision of construction and maintenance, publishing the NRA DMRB and NRA MCDRW. In 2016 the NRA merged with the Railway Procurement Agency (RPA) to form a new organisation, Transport Infrastructure Ireland (TII).
St Martin's House
Waterloo Road
Dublin 4
NRA
Ireland