Engineering Recommendation G83/2 Recommendations for the connection of type tested small-scale embedded generators (up to 16A per phase) in parallel with low-voltage distribution systems
Publication Year
2012
Document Status
Withdrawn
Document History
Superseded by G98/1-2, 2018, and G83/2-3 until 27 April 2019. Supersedes G83/1-1 2008 Recommendations for the connection of small-scale embedded generators (up to 16 A per phase) in parallel with public low-voltage distribution networks + Amendment 1 (June 2008).
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100