Click here to find out how to access this document
Post contract-award building information modelling (BIM) execution plan (BEP)
Publication Year
2013
Document Status
Current
Abstract
Details of the BIM Execution Plan (BEP), covering the post-contract which explains the supplier’s methodology for delivering the project using BIM.
Document History
Revision 1. This is one of the CPIx BIM strategy templates. These have been developed in consultation with the government BIM Task Group and are in accordance with PAS 1192-2.
Publisher Information
Construction Project Information Committee
CPIC is responsible for providing best practice guidance on the content, form and preparation of construction production information, and making sure this best practice is disseminated throughout the UK construction industry.
Greensleeves
Upper Soldridge Road
Medstead
Alton
CPIC
UK
Website: http://www.cpic.org.uk/
Email: sarah.delany@dsl.pipex.com
Tel: 01420 560068