Practice Notes 8 JCLI Practice Note No. 8: Revision 2: April 2017. Practice notes for the 2017 editions of JCLI Landscape works contract (JCLI LWC) and JCLI Landscape works contract with contractor's design (JCLI LWCD)
Publication Year
2017
Document Status
Current
Abstract
Covers which contract to use, the work schedules, CDM regulations, correction of inconsistencies, liquidated damages, defects and establishment of plants, malicious damage, payment, retention, temporary protection, watering, frost damage, plants/specification, amendments, and contractor's design.
Document History
Replaces JCLI Practice Note No. 8 Explanatory notes on the JCLI Landscape Works Contract 2008 and the JCLI Landscape Works Contract with Contractor’s Design 2008. May 2008. JCLI PN8rev1 Amd 1 2015-06. JCLI PN8rev2 April 2017. Supersedes: JCLI Practice Notes No 1 (April 1978), No 2 (April 1982), No 3 (April 1985 and all subsequent revisions), No 5 (June 1996 and all subsequent revisions), No 6 (April 2007), No 8 (May 2008) and No 8 Rev 1 (June 2012 and its Amendment 1 April 2015).
Publisher Information
Landscape Institute
The Landscape Institute is the chartered body for the landscape profession, promoting the protection, conservation and enhancement of the natural and built environment for the public benefit.
107 Grays Inn Road
London
LI
UK
Website: https://www.landscapeinstitute.org/
Email: contact@landscapeinstitute.org
Tel: 020 7685 2640