Concrete Advice 61 Cold joints
Publication Year
2017
Document Status
Current
Abstract
Examines how cold joints are formed and looks at their issues. Also shows the differences between cold joints and pour lines. Covers: lines at the formed surface, delay between placing batches, coping with a cold joint, investigating potential cold joints, structural considerations, design codes and water seepage.