Engineering Recommendation G81/6 Framework for new industrial and commercial underground connections. Part 6 - installation and records. Issue 2
Publication Year
2016
Document Status
Current
Abstract
Covers requirements relevant to the installation and recording of new low voltage and high voltage underground electricity networks and associated distribution substations for industrial and commercial connections.
Document History
Supersedes 'Framework for installation and records of commercial and industrial underground connected loads up to and including 11kV. Part 6. (Issue 1 - Amendment 1 - January 2008)' (ENA, 2008). Replaces and supersedes ER G81 Part 6, 2008 (as amended). First published - 2004. Amendment 1 - 2008. Revised - 2016.
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100