Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom
Download from CIS *
* A valid subscription to The Construction Information Service is required to download this document.

Click here to find out how to access this document

Implementation of Schedule 3 to the Flood and Water Management Act 2010 for mandatory sustainable drainage systems (SuDS) on new developments. (Draft) frequently asked questions. Guidance for local authorities, developers, and statutory and non-statutory consultees

Publication Year

2019

Document Status

Current

Abstract

Comprises a set of frequently asked questions and suggested answers which accompany the Welsh Government's statutory guidance on sustainable drainage (SuDS). The questions cover the context of the requirement to include SuDS on new developments; implementation; SuDS Approving Body (SAB) role; design, construction, operation and maintenance of surface water systems; statutory and non-statutory consultation; SuDS application process; and the SuDS adoption process. Includes a glossary and flow chart of the SuDS approval process.

ISBN

9781789646245

Publisher Information

Welsh Government

The Welsh Government is the devolved government for Wales. They publish a number of strategies, policies, consultation papers, circulars, leaflets and posters. Previously known as Welsh Assembly Government.

Cathays Park
Cardiff
WG
UK

Website: https://gov.wales/
Email: customerhelp@gov.wales
Tel: 0300 0604400