Engineering Recommendation G98/1-4 Requirements for the connection of Fully Type Tested Micro-generators (up to and including 16 A per phase) in parallel with public Low Voltage Distribution Networks on or after 27 April 2019 (Issue 1, Amendment 4, June 2019)
Publication Year
2019
Document Status
Withdrawn
Abstract
Guidance on the GB technical requirements for the connection of Micro-generators in parallel with public Low Voltage Distribution Networks.
Document History
Incorporating Amendment 1, July 2018; Amendment 2, December 2018; Amendment 3, March 2019 and Amendment 4, June 2019. Supersedes Issue 1 - May 2018.
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100