Engineering Recommendation G59/3-7 Recommendations for the connection of generating plant to the distribution systems of licensed distribution network operators. Issue 3 Amendment 7 - September 2019
Publication Year
2019
Document Status
Current
Abstract
Guidance on technical requirements for the connection of Generating Plant to the Distribution Systems of licensed DNOs.
Document History
Produced by the Operations Directorate of Energy Networks Association. Revision history: G59/1 dated 1991. G59/2 dated August 2010. G59/2-1 dated March 2011. G59/3 dated September 2011. G59/3 dated November 2013. G59/3-1 dated August 2014. G59/3-2 dated September 2015. G59/3-3 dated February 2018. G59/3-4 dated July 2018. Amendment 1. August 2014. Amendment 2. September 2015. Amendment 3. February 2018. Amendment 4. July 2018. Amendment 5. May 2019. Amendment 6. June 2019. Amendment 7. September 2019.
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100