Engineering Recommendation G99 Requirements for the connection of generation equipment in parallel with public distribution networks on or after 27 April 2019 (Issue 1, Amendment 5, 2019)
Publication Year
2019
Document Status
Withdrawn
Abstract
Specifies the technical requirements for the connection of Type A, Type B, Type C and Type D Power Generating Modules to the Distribution Networks of licensed DNOs in Great Britain.
Document History
Superseded by Amendment 6, March 2020. Amendment 5, November 2019. Supersedes G99/1-3, December 2018. Incorporating Amendment 1 - July 2018, Amendment 2 - December 2018, Amendment 3 - December 2018, Amendment 4 - June 2019 and Amendment 5 - November 2019.
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100