Click here to find out how to access this document
Technical Guide 16 Temporary works for concrete bridges
Publication Year
2020
Document Status
Current
Abstract
Provides technical guidance for the design and installation of temporary works in concrete bridge construction, including the interaction with permanent works. Covers responsibilities, technical approval, concrete bridge substructures, in-situ deck, precast beam and in-situ slab deck, precast concrete box girder deck, incremental launched deck, cable stayed and extrados decks and offline construction.
Document History
TG16.
ISBN
9781999757823
Publisher Information
Concrete Bridge Development Group
The Concrete Bridge Development Group is an association of member companies and organisations, dedicated to the task of improving efficiency of the design, construction and maintenance of concrete bridges. They publish a range of technical guides, papers and current practice sheets based on research and group activities.
Riverside House
4 Meadows Business Park
Station Approach
Blackwater
Camberley
CBDG
UK
Website: http://www.cbdg.org.uk
Email: enquiries@cbdg.org.uk
Tel: 01276 33777