Engineering Recommendation G98/1-7 Requirements for the connection of Fully Type Tested Micro-generators (up to and including 16 A per phase) in parallel with public Low Voltage Distribution Networks on or after 27 April 2019 (Issue 1, Amendment 7, October 2022)
Publication Year
2022
Document Status
Current
Abstract
Guidance on the GB technical requirements for the connection of Micro-generators in parallel with public Low Voltage Distribution Networks.
Document History
Incorporating Amendment 1, July 2018; Amendment 2, December 2018; Amendment 3, March 2019, Amendment 4, June 2019, Amendment 5, August 2021, Amendment 6, September 2021 and Amendment 7, October 2022. Supersedes Issue 4 - May 2019.
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100