Engineering Recommendation G99/1-9 Requirements for the connection of generation equipment in parallel with public distribution networks on or after 27 April 2019 (Issue 1, Amendment 9, 03 October 2022)
Publication Year
2022
Document Status
Current
Abstract
Specifies the technical requirements for the connection of Type A, Type B, Type C and Type D Power Generating Modules to the Distribution Networks of licensed DNOs in Great Britain.
Document History
Amendment 9, March 2022. Supersedes Amendment 6, November 2020. Incorporating Amendment 1 - July 2018, Amendment 2 - December 2018, Amendment 3 - December 2018, Amendment 4 - June 2019 and Amendment 5 - November 2019, Amendment 6 - March 2020, Amendment 7 - August 2021, Amendment 8 - September 2021 and Amendment 9 - October 2022.
Publisher Information
Energy Networks Association
Energy Networks Association represents transmission and distribution network operators responsible for maintaining the infrastructure for gas and electricity in the UK and Ireland.
4 More London Riverside
LONDON
ENA
UK
Website: http://www.energynetworks.org
Email: info@energynetworks.org
Tel: +44 (0) 20 7706 5100