Research Report 57 Pervious macadam: trials on trunk road A38 Burton bypass, 1984
Publication Year
1986
Document Status
Current
Abstract
Full-scale trials of pervious macadam laid on A38 Burton Bypass in 1984 are described. The objective of the trials is to compare the performance of a number of proprietary and non-proprietary materials made with a range of polymer-modified and unmodified bitumens. An experimental binder drainage test was used to specify the target binder contents. Analysis results show that generally binder drainage was not a problem; good control of both mixing temperature and binder content at the plant helped to ensure the successful laying of the trial materials.
Publisher Information
Transport Research Laboratory
The Transport Research Laboratory (TRL) is an internationally recognised organisation providing research, consultancy, testing and certification for all aspects of transport.
Crowthorne House
Nine Mile Ride
Wokingham
TRL
UK
Website: http://www.trl.co.uk/
Email: enquiries@trl.co.uk
Tel: 01344 773131