Engineering Recommendation G59/3-7
|
Recommendations for the connection of generating plant to the distribution systems of licensed distribution network operators. Issue 3 Amendment 7 - September 2019
|
2019
|
Current
|
Engineering Recommendation G59/3
|
Recommendations for the connection of generating plant to the distribution systems of licensed distribution network operators
|
2013
|
Withdrawn
|
Engineering Recommendation G59/3
|
Recommendations for the connection of generating plant to the distribution systems of licensed distribution network operators
|
2014
|
Withdrawn
|
Engineering Recommendation G75/1
|
Recommendations for the connection of embedded generating plant to Public distribution systems above 20kV or with outputs over 5MW (Available from ENA at www.energynetworks.org)
|
2002
|
Current
|
Engineering Recommendation G81/1
|
Framework for design and planning, materials specification, installation and record for low voltage housing development installations and associated, new, HV/LV distribution substations. Part 1: Design and planning (Withdrawn)
|
2004
|
Withdrawn
|
Engineering Recommendation G81/1
|
Framework for design and planning, materials specification, installation and record for low voltage housing development installations and associated, new, HV/LV distribution substations. Part 1: Design and planning. (Issue 2 - Amendment 1 January 2008)
|
2008
|
Withdrawn
|
Engineering Recommendation G81/1
|
Framework for new low voltage housing development installations. Part 1 - design and planning. Issue 3 - 2016
|
2016
|
Current
|
Engineering Recommendation G81/2
|
Framework for design and planning, materials specification, installation and record for low voltage housing development installations and associated, new, HV/LV distribution substations. Part 2: Materials specification (Withdrawn)
|
2004
|
Withdrawn
|
Engineering Recommendation G81/2
|
Framework for design and planning, materials specification, installation and record for low voltage housing development installations and associated, new, HV/LV distribution substations. Part 2: Materials specification. (Issue 1 - Amendment 1 - January 2008)
|
2008
|
Withdrawn
|
Engineering Recommendation G81/2
|
Framework for new low voltage housing development installations. Part 2 - materials specification
|
2016
|
Current
|
Engineering Recommendation G81/3
|
Framework for design and planning, materials specification, installation and record for low voltage housing development installations and associated, new, HV/LV distribution substations. Part 3: Installation records (Withdrawn)
|
2004
|
Withdrawn
|
Engineering Recommendation G81/3
|
Framework for design and planning, materials specification, installation and record for low voltage housing development installations and associated, new, HV/LV distribution substations. Part 3: Installation records. (Issue 1 - Amendment 1 - January 2008)
|
2008
|
Withdrawn
|
Engineering Recommendation G81/3
|
Framework for new low voltage housing development installations. Part 3 - installation and records
|
2016
|
Current
|
Engineering Recommendation G81/4
|
Framework for design and planning of industrial and commercial underground connected loads up to and including 11kV. Part 4: Design and planning. (Issue 2 - Amendment 1 - January 2008)
|
2008
|
Withdrawn
|
Engineering Recommendation G81/4
|
Framework for design and planning of industrial and commercial underground connected loads up to and including 11kV. Part 4: Design and planning (Withdrawn)
|
2004
|
Withdrawn
|
Engineering Recommendation G81/4
|
Framework for new industrial and commercial underground connections. Part 4 - design and planning. Issue 3
|
2016
|
Current
|
Engineering Recommendation G81/5
|
Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV. Part 5. (Issue 1 - Amendment 1 - January 2008)
|
2008
|
Withdrawn
|
Engineering Recommendation G81/5
|
Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV. Part 5 (Withdrawn)
|
2004
|
Withdrawn
|
Engineering Recommendation G81/5
|
Framework for new industrial and commercial underground connections. Part 5 - materials specification. Issue 2
|
2016
|
Current
|
Engineering Recommendation G81/6
|
Framework for installation and records of commercial and industrial underground connected loads up to and including 11kV. Part 6. (Issue 1 - Amendment 1 - January 2008)
|
2008
|
Withdrawn
|