A wide range of interesting articles that help you make informed decisions and deliver the best projects for your clients authored by our team of NBS subject specialists and construction industry contributors.
One handy email packed with construction
knowledge. Sign up today.
The research survey for our 2025 Digital Construction Report is now open, and we want to hear your views on the latest technology trending among construction professionals and the ongoing impact of AI. Take the survey now and get early access to the report findings.
Many smaller practices work on less complex construction projects. While there is no universal definition of what a ‘small works’ project is, it is generally characterized by being simple, using straightforward methods, and it is typically procured following a traditional methodology.
Based on a webinar of the same name by NBS Technical Author James Smith, this article looks at the importance of having a robust fire safety strategy and why it should be integrated into your specification.
The specification is the backbone of any project. Products must be researched, selected and agreed with the client, with finishes and facades requiring careful consideration and discussions with clients, planners and other stakeholders.
CPD is a crucial part of any architects role. As it’s usually delivered in person, lockdown proved a challenge for those wishing to attend CPD seminars. As a result, as the construction industry shifts online, so has CPD. Phil Ward, at Lee Evans Partnership, shares his experience of attending his first virtual RIBA CPD seminar.
In this article, the process followed at AHMM, which aligns to this RIBA Plan of Work framework, is outlined. Complexities that relate to the following are covered: preparing for specification writing; providing clarity between descriptive and prescriptive specifications; and coordinating specifications with the wider set of project information.
This year’s 2020 BIM report marks the 10th year of asking the industry for their views about BIM. Read the latest on the state of BIM, reflecting the views of over 1,000 industry professionals. See how usage and views of BIM have changed since 2011. What progress have we made as an industry and what changes do we anticipate in the next decade?
Sustainability is arguably the most expansive strategy in the RIBA Plan of Work 2020. It is also a topic that is being asked about increasingly when specifiers are reaching out to NBS to know more about how our technical content can help them achieve sustainable outcomes for their projects.
The increasing frequency for as-built point cloud scans as part of the delivery of a project is a sign that clients are no longer willing to rely on design models unchecked and issued as record information. However, the approach that contractors are taking is a reactive one which fails to make use or take the full benefit of the technology.
Over recent years, one of the most popular requests for improvements from construction professionals who use NBS has been the request for prominent evidence of third-party certifications regarding construction manufacturer products.
With the launch of our new platform, NBS Source, we at NBS have enhanced the data structure for manufacturer products and systems within our listings. We’re calling this ‘enhanced data’.
Within NBS Source, each item (whether it is a product, a company, a case study or a PDF) has a short, permanent hyperlink. Within NBS, we are calling these short, permanent hyperlinks ‘permalinks’.
In April 2020 Dale Sinclair, Director of Technical Practice at AECOM gave a presentation giving an overview to the RIBA Plan of Work 2020. Following the session, a number of questions were raised by attendees. These questions are addressed below by Dale and Alex Tait, Head of Technical Practice at RIBA.